Blog

Going to bat for BAT–quick update

The heat wave broke yesterday, and I made a lot of progress! The blocks are cut, I decided on the order to use to assemble the quilt top, and Hugh and I arranged the blocks in six labeled stacks, under the supervision of Mac and Lillie.  Next, I cut vertical sashing strips from the wood grain fabric–think baseball bats–and assembled two of the rows. I can work on the rows downstairs (where it’s definitely cooler)–it’s good to have more than one sewing machine 🙂

Leave a Reply

Friday, October 30, 2026